Structure 3: Applying line loads and producing a schedule
In Autodesk Revit Structure 3, applying loads to your BIM is a
relatively simple procedure. In this exercise we will work with line
loads.
To use the load tools you will need to select the “Modeling” tab, then
“Loads.”

Now after selecting the line load from the Options bar, select
“Properties” to place your 0.5 Kips/ft along the Y axis for column D for
the roof level.


After selecting the line load from your Options bar, again select
“Properties” to place your 0.75 Kips/ft along the X axis for column 1
for the roof level.

Adding Tags to loads are just as easy as adding tags to doors. Select
the “Drafting” tab, click “Tad” then choose “By Category.”

In the “Line Loads” field, choose “Load Tag” if prompted, then tag the
load lines placed on the roof earlier.


To schedule the loads, select your “View” drop-down or sidebar, “New
Schedule/quantities,” then “Line Loads.”

Now add Load case, Description, Nature, Fx1, Fy1, Fz1, and Uniform Load
in the fields area.

Click “OK” and your line load schedule is complete. Now add to your
sheet with a view, and you’re ready to go.